Wastewater Treatment Facility Optimization Study, Yermo Annex, Marine Corps Logistics Base, Barstow, CA.

TREVET conducted a comprehensive site investigation that evaluated treatment efficiencies, design flows, hydraulics, and equipment at the plant. Although plant performance was found to be acceptable, study findings included proposals for improvements to pump capacities and controls, for upgrades to equipment, and for additions at the control building to improve working conditions. Recommendations for increasing biological treatment and peak flow efficiencies at the plant through changes in operational design and processes were also made.