Ammunition Supply Point Upgrades – Design-Build
Marine Corps Base Camp Pendleton, CA
Under contract to the Navy’s prime contractor, Trevet provided civil engineering design services for upgrades to the Ammunition Supply Point at the base. Site development and design were performed for a 7,631 square foot ammunition segregation facility, a 10,316 square foot soil covered high explosive magazine, and a 12,357 square foot small arms magazine. Design services also included over two miles of potable water line and a booster pump station; two 125,000 gallon fire storage tanks; over two miles of sewer force main, gravity sewer, and a sewer lift station; and storm water facilities developed in accordance with Trevet’s site-specific hydrology report.