Energetic • Responsive • Experienced


Compliance

Sanitary Sewer Management Plan (SSMP), Marine Corps Logistics Base Barstow, CA.

TREVET prepared the Nebo Main and Yermo Annex SSMPs in compliance with the State of California general waste discharge requirements for sanitary sewer collections systems, which address system design and operations and maintenance considerations to reduce and eliminate sanitary sewer overflows. Two-hundred fifty sewer manholes were located and surveyed using GIS mapping and closed-circuit television inspections of mains and laterals. A sewer hydraulic model was developed, sewer defects discovered in the field were assessed, a Capital Improvement Plan and SSMPs were completed.

Related Works.

Loading

Water Supply Well Surveys, Potential Perfluoroalkyl Substance (PFAS)

Water Supply Well Surveys, Potential Perfluoroalkyl Substance (PFAS)

Installation Restoration Program Monitoring and RCRA Compliance Inspections

Installation Restoration Program Monitoring and RCRA Compliance Inspections